- Diesel-powered generators
- Multiple POEs (Point of Entry) for fiber, electricity and generator inputs, with n+3 redundancy
- Capacity Planning - No fiber optic link will ever peak at more than 33% of its
capacity. The capacity-load-ratio of C I Host's network connectivity has always been at
least 3:1
- 100Mbps connections to C I Host's routers and switches from your server. 1000Mbps
(GigE) connections from our routers and switches to the Internet fiber connectivity
- Instant growth and scalability - We scale and grow as your business demands it -
upgrades take less then one hour
- 24/7 Secured access with key swipe entry, biometric thumb print verifier and a
double-locking man-trap at every door within the datacenter and on the exterior
- 24/7 on-site maintenance staff with spare parts for all server configurations
- Multiple GigE connections on C I Host's privately-owned dark fiber optical network.
These GigE connections link to multiple, redundant carriers to make sure servers are
always connected to the Internet
- Security system with live monitored internal cameras
- Instant on dry-pipe fire protection systems
- 19" and 23" seismically braced racks
- Category 5 & Category 6 Cable
|